Grid Connection Optimization
The grid connection point determines the costs for the cable route and feed-in infrastructure. In order for your project to achieve the economic optimum, you should use your rights under the EEG and critically question the assigned connection point. The assigned connection variant is – more often than one should think – capable of improvement.
For this purpose, we create our own grid compatibility calculations and determine the actual best connection option. We contribute our experience to the negotiations with the grid operator – on an equal footing – and ensure the best possible solution for you.
In recent years, our customers have been able to recover more than €15 million in grid connection costs.